MEPCO Load Shedding Schedule and Feeder Status

MEPCO Bill Checker helps electricity consumers across South Punjab check the available MEPCO load shedding schedule through the official PITC portal. Search with your 14 digit reference number, city, grid station, or feeder name. You can view feeder details, today’s schedule, tomorrow’s planned timings, and available status information. No registration is required. This guide also explains scheduled cuts, maintenance shutdowns, and local faults.

⚡ Check MEPCO Feeder Status

Find your feeder, grid station, subdivision, and available load shedding schedule through the official PITC portal.

✓ Official PITC Portal ✓ No Registration ✓ Instant Feeder Details

Enter your 14-digit reference number on the official PITC portal to view your feeder name, grid station, subdivision, and available schedule.

⚡ Check Feeder Status →

Need your electricity bill instead? Check your MEPCO bill online →

How to Check the MEPCO Load Shedding Schedule Online

Use the official PITC Load Management Portal to check the feeder linked to your connection.

  1. Open the PITC Load Management Portal.
  2. Enter your 14 digit reference number.
  3. Select the search button.
  4. Confirm the feeder and grid station.
  5. Check today and tomorrow timings.
  6. Review the available feeder status.

You can also search by city, grid station, feeder name, or feeder code. The portal may show the feeder, grid, subdivision, schedule, actual outage, and ON or OFF fields. (ccms.pitc.com.pk)

Can I Check My MEPCO Feeder Status by Reference Number?

Yes. Your reference number helps the portal find the feeder linked to your electricity connection.

Use the 14 digit reference number from a recent MEPCO bill. Do not enter the 10 digit Customer ID.

DetailReference NumberCustomer ID
Length14 digits10 digits
Main useFeeder and schedule searchElectricity bill lookup
LocationPrinted on a MEPCO billPrinted on a MEPCO bill

Use a recent bill if your meter or connection details recently changed.

What Does the PITC Load Management Portal Show?

The official portal may display these fields:

Portal FieldSimple Meaning
FeederThe distribution line supplying your area
GridThe grid station supplying that feeder
SubdivisionThe local MEPCO operations office
Feeder StatusThe available status for that feeder
ScheduleThe planned status for that hour
ActualThe outage information shown for that period
ON or OFFThe feeder status shown by the portal

The portal includes separate columns for today, tomorrow, and yesterday. Some fields may remain empty when data is unavailable.

How to Read Today and Tomorrow Timings

Find the hourly row that matches your local time. A listed schedule means a planned interruption may apply during that period.

Tomorrow’s timings can help you plan:

  • Online classes
  • Office work
  • Shop hours
  • Mobile charging
  • Water pump use
  • UPS charging
  • Internet backup

Check the portal again near the listed time. Network conditions may change during the day.

Why Is Electricity Off When the Schedule Shows ON?

A sudden fault may not appear as planned load shedding.

Possible causes include:

  • Feeder tripping
  • Transformer failure
  • Damaged supply lines
  • Grid station problems
  • Maintenance work
  • Emergency load management
  • A fault inside your property

Check whether nearby homes or shops also have no electricity. If only your property is affected, check the main breaker safely. Never touch fallen wires, damaged poles, or exposed electrical equipment.

Load Shedding, Planned Shutdown, or Local Fault?

These terms describe different electricity problems.

SituationMeaningBest Next Step
Load sheddingPlanned feeder level load managementCheck the PITC schedule
Planned shutdownMaintenance or network workCheck the dated MEPCO notice
Feeder faultA feeder trip or distribution problemRegister a supply complaint
Transformer faultA local equipment problemContact MEPCO
Property outageA breaker, wiring, or meter issueCheck the property safely

MEPCO Power Shutdown and Maintenance Schedule

A planned shutdown normally relates to repairs, maintenance, or network work.

MEPCO shutdown notices may include:

  • Circle name
  • Memo number
  • Notice date
  • Shutdown date
  • Affected feeders
  • Affected areas
  • Start time
  • End time

Always check the memo date before using a shutdown notice. The official archive can contain older documents. Do not treat an old memo as today’s schedule. Check official MEPCO shutdown notices.

Does One Load Shedding Schedule Apply to the Whole City?

No. Different parts of the same city can connect to different feeders. Nearby streets may have different timings. Their feeders or grid stations may not be the same. Use your own reference number instead of relying on old social media or WhatsApp schedules.

MEPCO serves these 13 districts in South Punjab:

MEPCO DistrictsMEPCO Districts
ملتانمظفر گڑھ
لیہڈیرہ غازی خان
راجن پورلودھراں
BahawalpurRahim Yar Khan
خانیوالساہیوال
پاکپتنوہاڑی
بہاولنگر

MEPCO confirms these districts within its official service territory. (mepco.com.pk)

What Should I Do When No Feeder Schedule Appears?

Try these checks:

  • Recheck all 14 digits.
  • Remove spaces and extra characters.
  • Use a recent electricity bill.
  • Confirm the connection belongs to MEPCO.
  • Search by city, grid station, or feeder.
  • Refresh the official portal later.
  • Check MEPCO shutdown notices.
  • Report the outage if supply remains unavailable.

A missing result may mean an input error, missing data, or a temporary portal issue.

How to Report an Unscheduled MEPCO Power Outage

Check the feeder schedule before filing a complaint. If no planned outage appears, use the official CCMS complaint portal. Report a MEPCO Power Outage

You may also contact MEPCO through:

  • 118
  • 0800 63726

Keep these details ready:

  • 14 digit reference number
  • Consumer name
  • Area and nearest landmark
  • Feeder name, when available
  • Time the electricity failed
  • Whether nearby properties are affected

For wrong readings or billing errors, read the ایم ای پی سی او بل درست کرنے کے لیے گائیڈ.

Why Can MEPCO Load Shedding Timings Change?

Timings may change because of:

  • Electricity demand
  • Grid conditions
  • Feeder faults
  • Maintenance work
  • Emergency instructions
  • Local network problems

Do not rely on fixed city wide estimates.

Check the feeder linked to your own connection for the most relevant available information.

Steps to Take Before a Scheduled Power Cut

A few simple actions can reduce disruption:

  • Charge phones and power banks.
  • Save computer work.
  • Fill required water containers.
  • Charge the UPS battery.
  • Keep emergency lights ready.
  • Unplug sensitive electrical equipment.
  • Plan important shop or office tasks.
  • Keep complaint numbers saved.

For cost and usage planning, read the MEPCO peak hours and electricity saving guide.

عمومی سوالات

Yes. The PITC portal supports searches by city, grid station, feeder name, and feeder code.

It means the portal shows that feeder as unavailable at that time. Check the schedule and shutdown notices.

Yes. The official portal includes a tomorrow column. Check it again before the listed time.

No. Load shedding manages electricity supply. A shutdown usually relates to repairs, maintenance, or network work.

Your homes may connect to different feeders or transformers. Search using your own reference number.

The cause may involve a feeder trip, transformer fault, line problem, maintenance work, or emergency interruption.

Important Disclaimer

MEPCO Bill Checker is an independent consumer help website. It is not affiliated with MEPCO, PITC, WAPDA, NEPRA, or any government department. Schedule and feeder information may change because of faults, maintenance, demand, or revised operating instructions.

Always confirm time sensitive information through the official PITC or MEPCO portal.